DENVER, CO – (31 May, 2018) – Pure Energy Minerals Limited (TSX VENTURE: PE) (OTCQB: PEMIF) (the “Company” or “Pure Energy”) is pleased to announce the completion of basic design for the pilot plant at its flagship Clayton Valley Project (“CV Project”). Pure Energy has been working closely with its engineering providers to achieve theREAD MORE
Author: PEM
DENVER, CO – (23 May, 2018) – Pure Energy Minerals Limited (TSX VENTURE: PE) (FRANKFURT: A111EG) (OTCQB: PEMIF) (the “Company” or “Pure Energy”) announces that it has accepted the resignation of Mr. Bassam Moubarak from the board of directors of the Company. The Company has appointed Mr. Frank L. Wells, Jr. to fill the vacantREAD MORE
DENVER, CO – (22 May, 2018) – Pure Energy Minerals Limited (TSX VENTURE: PE) (FRANKFURT: A111EG) (OTCQB: PEMIF) (the “Company” or “Pure Energy”) is pleased to announce the results from the first two boreholes at its Terra Cotta Project (“TC Project”) in Salar de Pocitos, Salta Province, Argentina. Anomalous concentrations of lithium were discovered inREAD MORE
DENVER, CO – (5 April, 2018) – Pure Energy Minerals Limited (TSX VENTURE: PE) (OTCQB: PEMIF) (the “Company” or “Pure Energy”) is pleased to announce that it has filed a revised technical report on SEDAR entitled “Preliminary Economic Assessment (Rev. 1) of the Clayton Valley Lithium Project, Esmeralda County, Nevada”. The revisions to the technicalREAD MORE
DENVER, CO – (27 February, 2018) – Pure Energy Minerals Limited (TSX VENTURE: PE) (OTCQB: PEMIF) (the “Company” or “Pure Energy”) is pleased to provide an update on its flagship Clayton Valley Project (“CV Project”). After announcing its intent to proceed with a pilot plant in Nevada to achieve several objectives on the path toREAD MORE